official development partner of Quibo Energy

Charging infrastructure for commercial fleets — planned, built, operated.

We develop and build megawatt-scale charging sites and battery storage: grid connection, permitting, funding, construction and commissioning. As general contractor, it stays one contract, one price, one schedule.

Market environment

Tolls, fleet emission limits and funding determine the timing.

June 30, 2031Until this day, zero-emission trucks drive toll-free in Germany. It is the only legally fixed date of the transition.BFStrMG
€200per tonne of CO₂ that diesel pays via the CO₂ toll, since December 2023. (BFStrMG)
−45%CO₂ that truck manufacturers must achieve on fleet average from 2030. (Regulation (EU) 2024/1610)
€1 billionmade available by the federal government for truck charging infrastructure by 2029. (BMV, 05.2026)

The toll is the only cost item that disappears entirely with the switch.

Charging capacity for depots in Germany by 2030

Total demand 14 GW

2.6 GWpublicly planned
11.4 GWarise on companies' own yards
The principle

The storage system decouples charging capacity from the connection capacity.

Your connection delivers what it delivers. The battery fills from it over the day and releases the peak once the fleet is back at the yard in the evening.

MEDIUM VOLTAGE TRANSFORMER STORAGE 2,036 kWh CHARGING POINTS CONNECTION 400 kW CHARGING POWER UP TO 1,000 kW decoupled Storage decouples what the grid connection supplies from what the vehicles draw.
Services

Three service areas for one task: the plannable conversion of your fleet.

Separate contracts owe deliverables — the general contractor owes the result.

The limiting factor is the grid connection, not the vehicle. Whoever applies for the connection early moves forward the point at which the fleet can run.

References

Installations that are already in operation.

  • Mobile Power Plant in a container at an operating yard, with a charging postBerlin, Germany · September 2025

    First Mobile Power Plant in Europe

    20 ft: 400 kW, 1.069 MWh, one 400 kW charger. 40 ft: 800 kW, 2.135 MWh, two 400 kW chargers.

  • Charging park with solar canopy and storage container in BudapestBudapest, Hungary · October 2023

    Solar, storage and charging park

    499 kW solar, 4 × 160 kW charging capacity, 1,000 kW / 1,160 kWh storage.

  • Demonstration facility with charging bays and solar in NingdeNingde, China · 2023

    Demonstration facility

    35 kW solar, 232 kWh storage, 200 kW, four charging bays, 600 A per connector.

  • Charging bays with storage system of the microgrid in TianjinTianjin, China

    Microgrid with island operation

    60 charging bays, 1 MW / 1.2 MWh, peak shaving, backup power.

  • Charging park with covered charging bays in HangzhouHangzhou, China

    Charging park with bidirectional charging

    64 charging bays, 1.8 MW / 2.1 MWh, frequency and peak-load control.

  • Fast-charging park with covered charging bays in ChinaChina

    Fast-charging park

Realized by Quibo Energy, under the Sunnic / SNETL brand until 2026. Figures per manufacturer documentation.

About EVS-Q
Next step

The site first. Then the numbers.

Tell us where your yard is and how many vehicles you want to convert. We will get back to you within two working days.