Site Development
The connection sits at the start of the project, not at the end.
We handle grid information, connection request, permitting and construction — one contract partner for the entire site.
Starting point
The limiting factor is the grid connection, not the vehicle.
Connection commitments take six to twenty-four months depending on the grid operator. Whoever applies early moves forward the point at which the fleet can run.
The pace
Two stages we can commit to.
Week 0 to 2 — Intake. We record load profile, fleet plan and site. From this it follows how much power the yard will need in future and when.
Week 2 to 6 — Grid information and sizing. We ask the grid operator what the connection can provide and size storage and charging points accordingly.
Week 6 to 10 — Application. The connection request goes out, and the financing framework is in place.
After that — the grid operator's pace. During this time, permitting design, funding application, execution planning and procurement continue. At the end come construction, commissioning and acceptance; maintenance afterward runs through CATL's European service network.
The connection
What we do with the grid operator for you.
The grid connection decides the schedule, not the technology. We run the process from start to finish: Grid information — what is actually available at the site. Connection request — the formal application with the capacity value we derive from your load profile. Point of connection — exactly where feed-in and offtake occur, and what that means for the routing across your property.
In parallel, everything not tied to the grid operator keeps moving: permitting design, funding application, execution planning and procurement. That is why the waiting time loses its sting — it is not a pause, but the time in which everything else gets finished.
With separate contracts, each trade owes its deliverable. The general contractor owes the result.
Responsibility
Three parties, one responsibility.
A charging site rarely fails because of the technology. Often, however, it fails because of coordination.
The site first. Then the numbers.
Tell us where your yard is and how many vehicles you want to convert. We will get back to you within two working days.