Mobile Power Plant in a 20-foot container next to a truck at an operating yard

Mobile Power Plant

The unit is set up, not built.

A container arrives on a semi-trailer, is standing within a day, and delivers charging capacity that the grid connection alone cannot provide.

Arrival

A container, delivered on the semi-trailer.

No foundation, no building application for the site, no crane. The unit stands where it is needed and moves on once the grid connection is in place.

6,058 mm 2,591 mm SEMI-TRAILER, APPROX. 16.5 m Weight approx. 26.5 t · Container protection ≥ IP54 · Operation −20 to +50 °C 1,000 kW · 2,036 kWh
1,000 kW
power
2,036 kWh
capacity
3 months
delivery time

The principle

Same night, same connection.

On the left, the yard charges what the connection provides. On the right, storage is added — the same night, the same connection capacity, eight times as many vehicles.

WITHOUT STORAGE WITH STORAGE Two vehicles overnight. Sixteen vehicles overnight. 16 SAME CONNECTION: 400 kW SAME CONNECTION: 400 kW 400 kW over ten hours plus 2,036 kWh from storage, minus around 5% system losses, equals around 5,700 kWh per night.

Applications

Three tasks the unit is built for.

Mobile Power Plant at a logistics yard with semi-trailers
Logistics yard

Charging without grid expansion

The fleet charges overnight, even though the connection cannot provide it.

Mobile Power Plant with a connected truck during the bridging period
Bridging

Until the connection arrives

The grid operator's commitment takes time. Operations do not wait.

Mobile Power Plant at a construction site
Construction site

Power without diesel

Equipment and vehicles charge where there is no grid.

Two generations

The unit you get today is the second one.

The first generation worked with battery cabinets: 20 ft with 400 kW and 1.069 MWh, 40 ft with 800 kW and 2.135 MWh. The first unit in Europe has been in operation this way since September 2025.

The second generation works with battery packs. It fits into a single 20-foot container what used to require two — and it comes in three configurations, because power and capacity are sized independently.

Configuration 1
1,000 kW 2,036 kWh

High power and high energy — for yards that charge many vehicles in a few hours.

Configuration 2
500 kW 2,036 kWh

Same energy, half the power — for long dwell times through the whole night.

Configuration 3
750 kW 1,527 kWh

The middle path, when both load profile and footprint are constrained.

Power and capacity are configurable independently; the sizing follows your load profile, not a fixed size.

Datasheet

The sizing follows your load profile, not a fixed size.

Output power1,000 kW400 VAC ± 15%, 50/60 Hz
Capacity2,036 kWhCharge and discharge rate 0.5 P
Cycles10,000at 25 °C / 0.5 P, up to 12,000
Remaining capacity82%after 10 years, 365 cycles per year
Dimensions6,058 mm× 2,438 × 2,591 mm, 20 ft

Does it catch fire? CATL sets the safety target at nuclear power plant level: a fire probability below 10⁻⁵ per unit per year. Behind this is a pack design that prevents propagation — a single cell can fail without the pack following, with directed gas venting below the explosion limit.

Will it last ten years? The lifetime forecast is based on a third-generation model with a twenty-year calculation, verified by a third party. It is the basis for the 82% remaining capacity after ten years.

Will the warranty provider still be around then? A ten-year warranty is only as good as the company behind it. The provisions are on the balance sheet, and there is a dedicated plant in Thuringia.

Why wait for the grid connection, when the bridging solution is standing there in three months?

Next step

The site first. Then the numbers.

Whether a mobile unit is the right solution at your site depends on laydown area, connection and duration. We clarify that on site.