Signature line of a bound contract, fountain pen beside it

Financing

The acquisition cost must not be the reason a yard does not convert.

For every pattern there is a solution — from purchase through leasing to us operating the installation ourselves.

Three paths

From purchase to a fixed price per kilowatt-hour.

Which path fits depends on balance sheet, term and site. We run all three before you decide.

YOUR INVESTMENT OUR RESPONSIBILITY 1 PURCHASE WITH FINANCING You invest. Financing through your bank or a partner we introduce. Funding application by us. 2 LEASING OR HIRE-PURCHASE Contract between you and an established leasing company. We manage process and technology. 3 WE OPERATE We invest, build and operate. You pay a fixed price per kilowatt-hour. Where site and fleet permit it. A separate model applies to grid-scale storage: EPC+F.

We name the leasing partner in conversation. It is an established German leasing company; the contract runs between you and that company, and we steer the process and the technology.

Operating is one option, not the default. Where the site and fleet allow it, we act as operator ourselves. We do not offer this everywhere.

How we arrange it

We do not finance it ourselves — we bring together those who do.

The same approach applies to all three paths: we size the installation, run the numbers, and bring the right partner to the table — your bank, an established German leasing company, or, where we operate ourselves, our own capital. We prepare the funding application in every case.

What you compare in the end is not three offers from three companies, but the same installation in three financing forms. The technology, the schedule and the warranty do not change.

A separate model applies to grid-scale storage — EPC+F. It is covered under Utility BESS.

3
paths
1
contract
1
liable entity

In comparison

What this means for your balance sheet.

PathInvestmentBalance sheet
Purchase with financingwith youfixed assets
Leasing or hire-purchasespread over the termdepends on contract type
We operatewith usfixed price per kWh

A separate model applies to grid-scale storage: EPC+F.

Next step

The site first. Then the numbers.

Bring us a project where construction or financing is stuck. We will take a look at it.