Overhead line and substation in open countryside

Energy and Marketing

The yard is where the installation stands. The market is the place,  where it does business.

After construction, two questions follow: what the electricity costs and what the installation contributes when the fleet is not charging.

A day on the exchange

The price moves every day. Storage decides when.

Depot charging means: the vehicles stand at the yard overnight and charge there. Everything else follows from that — high power demand for a few hours and free capacity during the day.

00 03 06 09 12 15 18 21 24 MORNING PEAK MIDDAY DIP EVENING PEAK FLEET CHARGES THE FREE WINDOW FLEET CHARGES The fleet charges at night Charging has priority between 6 pm and 6 am. Electricity is then purchased for the fleet’s own needs, not for the market. The midday low lies in the free window Solar generation pushes prices down while vehicles are on the road. That is precisely when capacity is free. Peaks occur mornings and evenings The evening peak coincides with the start of the charging window — whatever remains free then goes to the market. The shape is typical, the height is not: peak timing and intensity vary with weather and season. No price statement or recommendation — the trading system decides every quarter-hour when to buy and sell.

The trading day

Trading begins the day before.

The volume for the next day is set at midday. After that, it is refined until five minutes before the delivery quarter-hour.

TRADING DAY — THE DAY BEFORE DELIVERY DAY 12:00 previous day Day-ahead auction A volume is set for every hour of the following day. 15:00 previous day Intraday auction The first correction — now accurate to the quarter-hour. from 16:00 previous day Continuous trading From here, adjustments continue around the clock. 5 minutes before Final correction Trading remains possible until five minutes before the delivery quarter-hour. Trading does not happen at one convenient time, but through gates: day-ahead at noon the previous day, intraday auction at 3 pm, then continuous trading until five minutes before delivery. The trading system operates in all four gates.
12 hours
free capacity
4 markets
day-ahead through balancing power
12,000
cycles of the new cell generations

The day at the depot

The fleet charges at night; during the day the capacity is free.

FLEET CHARGES CAPACITY AVAILABLE TO THE MARKET 00 03 06 09 12 15 18 21 24 TWELVE HOURS IN WHICH THE SYSTEM WORKS Day-Ahead Intraday auction Continuous intraday Ancillary services FOUR MARKETS, ONE WINDOW Typical depot profile; your charging windows follow from routes and departure times.

Wholesale. The installation trades on the day-ahead market, in the intraday auction and in continuous intraday trading. What is traded is the capacity that charging operation does not need.

Ancillary services. After prequalification with the transmission system operator, the installation offers primary control reserve (FCR) and secondary control reserve (aFRR). Availability itself is remunerated, not only activation.

Multi-market optimization. A trading system continuously decides which market delivers the higher contribution in the next quarter-hour, taking into account state of charge, cycle budget and battery aging.

Charging operation takes priority. The system knows departure times and reserves the state of charge; only what the fleet does not need is traded.

Depot charging

Why the yard needs storage at all.

Depot charging means: the vehicles stand at their own yard overnight and charge there instead of charging on the road. Everything else follows from that — high simultaneous power demand for a few hours, and free capacity during the day when the installation would otherwise have nothing to do.

What we can show beforehand. Before anything is built, we run your sizing against real market data from recent years: hour by hour, with your charging profile. The result is not a forecast, but the answer to what this installation would have earned in recent years.

What happens when. The offer is ready after about two weeks. Technical integration and registration with the grid operator take eight to twelve weeks and run during the construction phase. Trading begins with commissioning.

Charging operation takes priority. The system knows departure times and reserves the state of charge; only what the fleet does not need is traded.

Three revenue streams

What the installation does when the fleet is not charging.

In the free time, the storage system works the electricity markets. There are three ways, and they are not mutually exclusive — a trading system decides every quarter-hour which currently delivers the higher contribution, taking into account state of charge, cycle budget and battery aging.

01

Wholesale

The installation trades on the day-ahead market, in the intraday auction and in continuous intraday trading. Only the capacity that charging operation does not need is traded.

02

Ancillary services

After prequalification with the transmission system operator, the installation offers primary control reserve (FCR) and secondary control reserve (aFRR). Availability itself is remunerated, not only activation.

03

Multi-market optimization

The choice between these markets is not made by a person, but by a trading system — continuously, freshly for every quarter-hour.

04

Peak shaving

Independent of the markets, the installation dampens the depot's load peaks and thereby reduces the grid fee — a saving that adds to the revenues.

05

A weak connection is a factor, not an obstacle

Ramps, power limits and requirements from the distribution system operator limit what can be marketed — they do not rule out marketing.

No revenue guarantee: earnings fluctuate. What your sizing would have contributed, we calculate in the offer using real market data from recent years.

Our role

We do not trade ourselves.

We bring the marketing partner into the project, connect the installation technically and support the prequalification. Charging operation takes priority — only what the fleet does not need is traded.

The connection runs during the construction phase. Trading begins with commissioning.

Next step

The site first. Then the numbers.

What your installation can contribute besides charging depends on the charging profile. Send us your site and we will run the numbers.